Turning a Scoped Problem Into Week-One Slices

order the slices by what you most need to learn, not by what is easiest to build

Open the interactive lesson

You have already asked your questions and the problem is scoped. Now the interviewer says: "Good. You start Monday. What does your first week look like?" This is where a lot of candidates quietly lose the round, because they hand back a list of components, "ingest, model, API, UI", instead of a sequence of things a customer can see and react to.

Worked scenario used throughout: a manufacturer's warranty team receives claims as emails with photo attachments. Three people read each email, look up the serial number in a spreadsheet, and decide approve, reject or ask for more. The customer says: "we want to automate claim intake." Average handling time is, for example, around 25 minutes per claim and the backlog is growing.

What makes a slice a slice: four tests

A slice is not a layer of the architecture. "The database" is a layer. A slice is a thin, end-to-end piece of the real workflow that someone at the customer can actually look at. Before I put anything in the plan I run it through four tests, and I say them out loud in the round because they are the part interviewers are listening for.

1. Can the customer see it? If the slice ends with "the parser works" and nobody outside my laptop can observe that, it is not a slice, it is a task. A demo-able slice might be a spreadsheet of ten real claims with the extracted fields filled in, sent to the person who currently types them. The customer reacting to something real is worth more than an hour of me being sure.

2. Does it test the riskiest unknown? Every plan has one assumption that, if false, breaks the rest. In the warranty case it is not the approve or reject logic. It is whether the photos and emails are readable enough to pull a serial number out of at all. If half the serial numbers are blurry or typed with a missing digit, everything downstream is built on sand. So the first slice must aim directly at that.

3. Does it have a definition of done? Not "extraction mostly works" but a sentence with a number in it: "on 50 real claims the customer picks, the serial number is extracted correctly for at least 40, and every miss is listed with a reason." The number is for example; the habit is the point. Without it, a slice never finishes and you cannot tell the customer honestly whether to continue.

4. Can you stop after it? Each slice must leave the customer better off than before even if the engagement ended right then. A spreadsheet that pre-fills serial numbers saves a human a few minutes per claim. A half-built pipeline saves nothing.

:::key The one-line test Say it as: "after this slice, what will the customer have seen, what will I have learned, and what is the number that says we are done?" If any of the three answers is blank, the slice is not ready. :::

Ordering: the bad plan and the good plan, side by side

Here is the same eight days of effort, ordered two ways. The work is identical. Only the order differs, and the order decides when you find out you were wrong.

The bad ordering, which sounds professional: (1) design the data model and the schema, (2) build the ingestion service for the claims inbox, (3) build the extraction step, (4) build the approve or reject rules, (5) build a nice review screen, (6) show the customer. The customer sees nothing until the end, and the riskiest assumption, can we read serial numbers from real photos, is tested at step 3. If it fails there, steps 1 and 2 were built around a wrong assumption and a week is gone.

The good ordering: (1) take 50 real past claims by hand, no inbox integration at all, and run only serial-number extraction on them; (2) show the customer a spreadsheet with extracted value, confidence and a "could not read" list; (3) only then connect the live inbox; (4) add the lookup against their warranty spreadsheet; (5) add a suggested decision, shown to the human as a suggestion, never auto-applied; (6) polish the screen.

Notice what the good plan does. It starts with files you already have, so there is no integration waiting on the customer's IT team. It puts the unknown at the front. And it delays the thing that looks most like "automation", a decision, until the inputs are proven. Step 5 in the good plan is meaningless without step 1, and step 1 is useless to nobody: even on its own it hands a human a pre-filled field.

One honest cost of the good ordering: the first demo looks unimpressive, a spreadsheet, not a product. Say that in advance. "Wednesday's demo will look plain on purpose. It exists to tell us whether the next three weeks are worth building." A customer who has been warned is not disappointed by a plain demo; a customer who was promised a product is.

A day-by-day first week, with a definition of done and what you defer

Here is the week I would actually say aloud. Numbers are for example only; in a real round you adjust them to what the customer told you.

DayWhat I buildWhat the customer seesDone means
MonCollect 50 real claims, including the ugly ones; read ten by handNothing yet; a short note listing what I receivedI know the range of photo quality
TueExtraction of serial numbers only, run on the 50A sheet: value, confidence, "could not read" listAt least 40 of 50 correct, every miss has a reason
WedReview misses with the claims lead; decide what is fixableA 20-minute walkthrough, plain on purposeCustomer agrees the hit rate is good enough or names what would make it so
ThuLook up each serial in their warranty spreadsheetThe same sheet with warranty status addedStatus matches a human on at least 45 of 50
FriRun the whole thing on a fresh batch of 20 I have not seenA summary page, plus my written plan for week twoNumbers on the fresh batch are close to the first batch

The Friday row matters most. Testing on claims I have not tuned against is how I avoid fooling myself. If the fresh batch is much worse than the first, I tell the customer that on Friday, not in week four.

What I defer, and say aloud: no auto-approve or auto-reject, because a wrong automatic decision costs a customer relationship while a wrong suggestion costs a human ten seconds. No multi-language support until we see how many claims actually arrive in another language. No dashboard. No integration with their core claims system, because that is a month of their IT team's time and we have not yet shown the extraction is worth it. For each deferral I give the reason in the form "we do not yet know if it is needed", not "there is no time."

The contingency: if Tuesday's numbers come in under, say, half, I do not push on. I stop, show the customer why, and the likely answer becomes a different first slice: perhaps asking claimants to type the serial number into a form, which removes the unreadable-photo problem entirely. Finding that out on Tuesday is the whole point of this ordering.

Follow-ups they will ask

"The customer wants to see the full product on Friday, not a spreadsheet." I would not argue about the demo; I would explain what each version buys them. "I can show you a polished screen on Friday that runs on three hand-picked claims, or a plain sheet that runs on fifty real ones. Only the second tells you whether to fund the next month." Most customers pick the honest one when the choice is put that way. If they still want a screen, I build the thinnest possible one over the same real data, never a mock.

"Your first slice failed. What now?" Then it did its job. I would present the result plainly: here is what I tried, here is the hit rate, here is the pattern in the misses. Then I would offer the alternative slice that removes the root problem, such as changing how serial numbers are captured upstream. A failed first slice that costs two days is the cheap outcome the ordering was designed to produce.

"How do you pick the riskiest unknown when everything feels risky?" I ask which single fact, if false, makes the whole plan pointless. Not the thing that is hardest to build, and not the thing I am least familiar with, but the one whose failure changes the plan. If two candidates remain, I pick the one that is cheaper to test.

"What if the customer's IT team cannot give you the real data in week one?" Then getting data becomes the actual first slice, and I name it as such. I would ask for a hand-exported sample of 50 records, even redacted, and in parallel start the access request. If they cannot produce even a sample in a week, that is a finding about how the rest of the engagement will go, and I would say it to the sponsor early.

"How do you decide a slice is too big?" If I cannot describe what the customer will see in one sentence, or if it takes more than about two days before anyone outside my laptop sees it, I cut it in half and ask which half tests more.

How to say it in the interview

"I would not give you a list of components. I would give you five days where each day ends with something your team can look at and react to, and where the first thing I build is the thing I am least sure about, because that is the cheapest moment to be wrong."

Checklist

Practice this interactively